Caramondani Bellingham is a joint venture between Caramondani Bros and the world’s leading marina design-build construction company, Bellingham Marine. The 2 companies which have over 120 years of history and experience combined, joined forces with the initial aim to design and build the concrete floating docks and drystack of the iconic Ayia Napa Marina in Cyprus.
Slip mix
340 wet slips 10m – 85m
180 dry racks up to 10m
180 dry racks up to 10m
Project features:
Unifloat concrete docks
Brushed concrete decking
Steel piles with HDPE sleeves (1st in Cyprus)
Floating fuel dock (1st in Cyprus)
Fingers (1st in Cyprus)
Curved walkway (1st in Cyprus)
Extra wide walkway for golf cart traffic
Water taxi dock
Drystack facility (1st in Cyprus)
Brushed concrete decking
Steel piles with HDPE sleeves (1st in Cyprus)
Floating fuel dock (1st in Cyprus)
Fingers (1st in Cyprus)
Curved walkway (1st in Cyprus)
Extra wide walkway for golf cart traffic
Water taxi dock
Drystack facility (1st in Cyprus)
Project features:
New marina and drystack construction
Project features:
Design/build general contractor
Pile design and driving
Installation of docks and accessories
Supply/install, gangways
Supply/install, drystack
Pile design and driving
Installation of docks and accessories
Supply/install, gangways
Supply/install, drystack